Fastest lead times in Texas  •  UL 891 / UL 1558 assemblies  •  Free delivery planning in 3–5 days Call (951) 403-5738
Home / FAQ / How long does custom switchgear take to build
FAQ

How long does custom switchgear take to build

Four to six weeks from approved drawings is typical. Emergency builds can be faster when frames and breakers are in stock.

Four to six weeks from approved drawings is typical. Emergency builds can be faster when frames and breakers are in stock.

If your situation differs — a retrofit inside an existing enclosure, an unusual voltage, or a service that has already been upgraded once — send the details and we will tell you what applies. We quote from drawings, not from assumptions.

Call (951) 403-5738 or email saleselectricalbuyers@gmail.com.

Request a quote

Request a switchgear quote

Send your single-line or tell us the service size. We reply with pricing, lead time and a drawing schedule.

Call: (951) 403-5738
Email: saleselectricalbuyers@gmail.com

Or call (951) 403-5738
Request a Quote Call (951) 403-5738