Lead times

Switchgear lead times

Standard builds run four to six weeks from approved drawings. Here is what drives that number.

Typical schedule

Engineering and approval drawings3–5 business days
Material release (breakers, steel)1–2 weeks
Fabrication and assembly2–3 weeks
Testing and labeling2–3 days
Freight1–5 days by destination

What slows a project down

  • Drawings that change after approval
  • Breakers on allocation
  • Missing utility metering details
  • Site access that forces a shipping split

Emergency work

When a plant is down, call (951) 403-5738. If the frame and breakers are in stock we can compress the schedule significantly.

Request a quote

Request a switchgear quote

Send your single-line or tell us the service size. We reply with pricing, lead time and a drawing schedule.

Call: (951) 403-5738
Email: saleselectricalbuyers@gmail.com

Or call (951) 403-5738
Request a Quote Call (951) 403-5738