Switchgear built for data centers: 4000A service entrances, white space distribution, remote power panels and medium voltage lineups, engineered around uptime and fast delivery.
A data center electrical room is judged on one number: how long the load stays up. That changes the equipment. Service entrances are built as main-tie-main so either utility feed can carry the building, breakers are selected for coordination so a branch fault never trips a main, and every lineup is designed to be worked on live without dropping a hall.
We build those lineups from 400A to 6000A at 480Y/277V, 415/240V, 600V, 800V and 1000V, plus medium voltage service equipment from 5kV to 35kV where the utility delivers at distribution voltage.
Power flows from the utility transformer into the service entrance switchgear, then to distribution switchboards, then to remote power panels inside the white space, then to busway or whip connections at the rack row. Each step has its own fault level, its own breaker type and its own physical constraint.
The most common bottleneck is the electrical room itself. Sections have to fit the wall, doors have to swing, cable has to enter from the right direction, and cooling has to handle the heat the gear rejects. We lay out sections against the room drawing before fabrication, not after delivery.
Data center schedules are driven by the white space turnover date. We work backwards from that date: switchgear ships, terminates, tests and energizes, then the RPPs follow as rows are built out. Where a hall is being delivered in phases, we ship in phases instead of forcing a single large delivery.
Yes. Main-tie-main with kirk-key or electrically interlocked breakers is standard for data center service entrances.
Yes. We ship in phases tied to white space turnover rather than forcing one large drop.
Send your single-line or tell us the service size. We reply with pricing, lead time and a drawing schedule.