A 1200A distribution lineup built around a 1200A frame / 1200A trip with 65 kA @ 480V short-circuit rating — for large commercial buildings, hospitals, distribution centers.
A 1200 amp switchgear assembly sits between the utility transformer and the rest of your distribution. It takes one large incoming feed, provides a main disconnect with overcurrent protection, and splits that feed into feeder breakers that leave for panelboards, motor control centers or downstream switchboards.
At 1200A the frame is 1200A frame / 1200A trip, which is one of the most requested sizes for service entrance switchgear. Bus is copper, braced for 65 kA @ 480V, and the enclosure lands at roughly 60" wide per section, 90" tall and 22" deep — before you add any metering or utility compartment.
Send the single-line and the utility fault current. We confirm the breaker frame, bus bracing, enclosure type and available space, then issue approval drawings before anything gets cut. Standard delivery is four to six weeks; emergency builds can move faster when the frame and breakers are in stock.
A 1200A lineup is built for a specific system voltage. These are the combinations we quote most often:
Send your single-line or tell us the service size. We reply with pricing, lead time and a drawing schedule.
Call: (951) 403-5738
Email: saleselectricalbuyers@gmail.com