A 5000A distribution lineup built around a 5000A frame / 5000A trip with 100 kA @ 480V short-circuit rating — for utility-tied mains, large data center campuses.
A 5000 amp switchgear assembly sits between the utility transformer and the rest of your distribution. It takes one large incoming feed, provides a main disconnect with overcurrent protection, and splits that feed into feeder breakers that leave for panelboards, motor control centers or downstream switchboards.
At 5000A the frame is 5000A frame / 5000A trip, which is built to order with engineered bus bracing and forced-air options. Bus is copper, braced for 100 kA @ 480V, and the enclosure lands at roughly 150" wide per section, 90" tall and 32" deep — before you add any metering or utility compartment.
Send the single-line and the utility fault current. We confirm the breaker frame, bus bracing, enclosure type and available space, then issue approval drawings before anything gets cut. Standard delivery is four to six weeks; emergency builds can move faster when the frame and breakers are in stock.
A 5000A lineup is built for a specific system voltage. These are the combinations we quote most often:
Send your single-line or tell us the service size. We reply with pricing, lead time and a drawing schedule.
Call: (951) 403-5738
Email: saleselectricalbuyers@gmail.com